CEA Group has worked on numerous water, wastewater, reclaimed water and storm drain pipeline projects for El Paso Water and other municipal water districts throughout the El Paso region.
From small, localized storm drain systems to pipe networks ranging several miles, CEA has been involved in everything from planning and route studies to construction plans, specifications, estimates and construction administration.
Services include: